Site power for multi-year builds where the permanent supply arrives after the programme does.
We price against the actual programme duration rather than a daily rental card, run on a cleaner fuel that widens your permit envelope on constrained urban and industrial sites, and convert into the permanent plant if the build ends up needing one.
Mobile generation on site and carrying load in weeks, on bridge fuel from the first hour — not diesel.
Read moreTake an existing or planned diesel fleet and run it on renewable and low-carbon liquid fuels, with no engine replacement.
Read moreMedium-voltage switchgear, transformers, paralleling controls and protection, delivered as one package.
Read moreThe planned hand-off to utility supply, including what happens to the plant when your interconnection lands.
Read moreLoad profile, site location, required date. We come back with a rung-by-rung plan and a delivered cost at each phase.